|
|
|
|
|
|
|
|
|
|
|
|
|
We think first that the
systematic and continuous alimination of wasted
capital, materials, labor and time accomplished
by the identification and resolution of problems,(root
causes)and the reduction of variation. |
|
|
|
|
|
|
|
|
|
|
|
We always monitor the
processes with built in feedback and adjustment
steps and try to maintain the out come in conformance
with any requirements. |
|
|
|
|
|
|
|
|
|
|
|
Everybody has to understand
the goals of the quality management.
That means that each associate has participated
in setting up the quality system in order to satisfy
external and internal customer. |
|
|
|
|
|
|
|
|
|
|
|
Quality checks by each
associate at each production stage ensure that products
failing to meet our stringent standards don't even
get close to our factory door. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Kaesung
is an ISO9002 Accredited cmopany since 1997
|
|
|
|
|
|
|
|
|
|
|
Kaesung
is an ISO9002 Accredited cmopany since 2002
|
|
|
|
|
|
|
|
|
|
|
Kaesung
is an ISO9002 Accredited cmopany since 2002
|
|
|
|
|
|
|
|
|
|
|
|
|